The inside of the “the barn” (aka: GEM offices) has been fairly well finished since spring 2009. The exterior has taken a little longer to finish, but it is very close to being done. The only thing left is to replace the paving stones for the parking lot area (you might be able to see the old paving stones in front of the building).
 |
| Fall 2008 |
 |
| Summer 2009 – composite shot |
 |
| Spring 2010 – composite shot |